18 Years Factory Pipe Quenching Furnace - PDA105 series fan cooling programmable DC power supply – Injet
18 Years Factory Pipe Quenching Furnace - PDA105 series fan cooling programmable DC power supply – Injet Detail:
Specification parameters
| Performance index | ||||||||
| Conversion efficiency | 84%~90%(full load) | |||||||
| Power factor | 0.9~0.99(full load) | |||||||
| ppm/℃(100%RL) Temperature coefficient | 100 | |||||||
| Overall dimensions | 0.75kW~5kW,1U1U chassis;10kW~15kW,2-3U 2-3U chassis | |||||||
| Cooling mode | Fan cooling | |||||||
| Constant voltage mode | ||||||||
| (20MHz)mVp-p Noise | 70 | 100 | 130 | 150 | 175 | 200 | 300 | 400 |
| (5Hz-1MHz)mVrms Ripple | 30 | 35 | 35 | 35 | 65 | 65 | 65 | 65 |
| V Max. compensation voltage | ±3V | |||||||
| (100%RL) | 5×10-4(10kW Below 10kW) | 1×10-4(10kW Above 10kW) | ||||||
| (10%~100%RL) Load adjustment rate | 5×10-4(10kW Below 10kW) | 3×10-4(10kW Above 10kW) | ||||||
| (100%RL) Stability | 1×10-4(7.5~80V), 5×10-5(100~250V) | |||||||
| Constant current mode | ||||||||
| (20MHz)mVp-p Noise | 70 | 100 | 130 | 150 | 175 | 200 | 300 | 400 |
| (5Hz~1MHz)mVrms Ripple | 30 | 35 | 35 | 35 | 65 | 65 | 65 | 65 |
| (100%RL) Input adjustment rate | 1×10-4(10kW Below 10kW) | 5×10-4(10kW Above 10kW) | ||||||
| (10%~100%RL) Load adjustment rate | 3×10-4(10kW Below 10kW) | 5×10-4(10kW Above 10kW) | ||||||
| 8h(100%RL)DCCT Stability | 4×10-4(25A~200A), 1×10-4(250A~500A) | |||||||
FAQ
1. Can you identify your own products? Of course, we have our own LOGO, process and product traceability, so we can accurately identify our products.
2. Who are your sales team members? We have a huge sales team, mainly divided into industry directors, industry managers, sales directors, sales managers, etc.
3. What is the working time of your company? Our working hours are 8:30-12:30, 13:30-17:30 on weekdays.
4. Did your company attend the exhibition? What are they? We participated in a large number of industry conferences and exhibitions every year, such as Shanghai Photovoltaic Exhibition, Shanghai Semiconductor Exhibition, Titanium Industry Exhibition, China International Carbon Materials Conference, China International Energy Storage Conference, etc.
Product detail pictures:
Related Product Guide:
Assume full accountability to fulfill all demands of our purchasers; attain continual advancements by marketing the advancement of our clientele; grow to be the final permanent cooperative partner of purchasers and maximize the interests of purchasers for 18 Years Factory Pipe Quenching Furnace - PDA105 series fan cooling programmable DC power supply – Injet , The product will supply to all over the world, such as: Tunisia, Canada, Melbourne, Furthermore, all of our products are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our products, please don't hesitate to contact us. We will do our best to meet your needs.




