China Supplier Melting Electric Furnace - PDA103 series fan cooling programmable DC power supply – Injet
China Supplier Melting Electric Furnace - PDA103 series fan cooling programmable DC power supply – Injet Detail:
Specification parameters
| Performance index | ||||||||
| Conversion efficiency | 84%~90%(full load) | |||||||
| Power factor | 0.9~0.99(full load) | |||||||
| ppm/℃(100%RL)Temperature coefficient | 100 | |||||||
| Overall dimensions | 0.75kW~5kW,1U1U chassis; 10kW~15kW,2-3U; 2-3U chassis | |||||||
| Cooling mode | Fan cooling | |||||||
| Constant voltage mode | ||||||||
| (20MHz)mVp-p Noise | 70 | 100 | 130 | 150 | 175 | 200 | 300 | 400 |
| (5Hz-1MHz)mVrmsRipple | 30 | 35 | 35 | 35 | 65 | 65 | 65 | 65 |
| V Max. compensation voltage | ±3V | |||||||
| (100%RL) Input adjustment rate | 5×10-4(10kW Below 10kW) | 1×10-4(10kW Above 10kW) | ||||||
| (10%~100%RL) Load adjustment rate | 5×10-4(10kW Below 10kW) | 3×10-4(10kW Above 10kW) | ||||||
| (100%RL) Stability | 1×10-4(7.5~80V), 5×10-5(100~250V) | |||||||
| Constant current mode | ||||||||
| (20MHz)mVp-p Noise | 70 | 100 | 130 | 150 | 175 | 200 | 300 | 400 |
| (5Hz~1MHz)mVrmsRipple | 30 | 35 | 35 | 35 | 65 | 65 | 65 | 65 |
| (100%RL) Input adjustment rate | 1×10-4(10kW Below 10kW) | 5×10-4(10kW Above 10kW) | ||||||
| (10%~100%RL) Load adjustment rate | 3×10-4(10kW Below 10kW) | 5×10-4(10kW Above 10kW) | ||||||
| 8h(100%RL)DCCT Stability | 4×10-4(25A~200A), 1×10-4(250A~500A) | |||||||
Product detail pictures:
Related Product Guide:
Fast and fantastic quotations, informed advisers to help you choose the correct products that suits all your needs, a short manufacturing time, responsible good quality control and distinct companies for paying and shipping affairs for China Supplier Melting Electric Furnace - PDA103 series fan cooling programmable DC power supply – Injet , The product will supply to all over the world, such as: Angola, Bogota, Mexico, Profession, Devoting are always fundamental to our mission. We have always been in line with serving customers, creating value management objectives and adhering to the sincerity, dedication, persistent management idea.
Write your message here and send it to us


